Mon – Fri: 8:00 – 17:00
020 3840 4826

Case Study: Hull (Roadway)

SCOPE OF WORKS: HV Cable Install
OUTLINE:

JT were employed to install the ducting and HV cable between the point of supply and the point of connection. The project involved the use of our top cutting equipment to ensure a clean excavation was produced in the existing road way. Reinstatement of the concrete and tarmac roadways were completed as per the local authorities requirements. All traffic management was under the control of JT.